Case Studies Page 2
You are here: home > our clients > case study page 2
Burlington Danes Academy Phase I & II, London
Main Contractor: R Durtnell & Sons Ltd
Client: Absolute Return for Kids (ARK) Trading Ltd.
Site: Burlington Danes Academy Phase I & II, London
Value: £158,000 & £130,000
Scope of Work:
- Sarnafil single ply roof system with tapered insulation scheme. Kalzip aluminum standing seam insulated roof system on structural decking support.

5 Office Blocks – Granta Park, Cambridge and Milton Park, Abingdon
Main Contractor: Mace
Client: MEPC
Site: 5 Office Blocks – Granta Park, Cambridge and Milton Park, Abingdon.
Value: £699,000
Scope of Work:
- Permatec hot melt roof system, with inverted insulation, and ballast and paving slab finish. PPC aluminum coping system to perimeter walls. Sarnafil warm roof single ply system to plant room roofs. Kalzip aluminum standing seam insulated cladding system to plant room structures and perforated Kalzip aluminum standing seam cladding to plant screens.

O2 HQ, Slough
Main Contractor: Kier Moss
Client: O2
Site: O2 HQ, Slough
Value: £311,000
Scope of Work:
- Permanite Permaphalt polymer modified mastic asphalt full bond roof system with inverted insulation, and ballast and paving slab finish. Install lead capping over plant support plinths. Install structural metal decking and Sarnafil insulated single ply roofing system.
Back to Our Work
See Also:
- Sunrise Senior Living Projects
- New North School, Popham Road, Islington
- Speedwell Technology College, Speedwell, Bristol
- BMW Headquarters, Bracknell
The overall performance for this contract was scored by the Contract Administrator as excellent and we take this opportunity to congratulate the firm on this achievement
Hampshire County Council