Sarnafil Copper Patina Roof Finish

The works consisted of two phases, a Bauder felt roof replacement and a Sarnafil Plus adhered system both providing a 20 year insurance backed guarantee.

The first phase included removing of the existing chippings, roof build up and alterations to the rainwater goods. Supply and installation of Vapour Control Layer, Insulation and Bauder 2 layer felt system.  

The Sarnafil Plus works entailed stripping of the existing Zinc monopitch roof above the central hall area, supply and installation of new plywood deck, Sarnafil membrane, Décor Profiles, rainwater goods, lightning conductor, facias and soffits. The new Sarnafil membrane was specified in Copper Patina to replicate the surrounding roof types.